The custom lighting process


 

This is how your bespoke luminaire is created

 

A fully developed plan is not required for the initial enquiry. Often, an idea, a sketch or a floor plan is enough for us to assess the brief and work with you to determine the best course of action.


 

Phase 1: Concept and requirements

It all starts with your vision: a unique shape, a specific lighting effect, an architectural challenge, or a luminaire that doesn’t yet exist.

 

 

Together, we’ll clarify the key details. These include, amongst other things, dimensions, installation requirements, lighting effects, quantity, timetable, budget and the desired scope of work.

Uli Sattler in a lighting design meeting with a colleague, discussing drawings and concepts | © Alexander Strifler

 

Phase 2: Feasibility and cost analysis

During our regular specialist lighting meetings, experts from the design, electronics, lighting technology, manufacturing and assembly departments assess whether and how the desired solution can be implemented.

 

 

You will receive a clear assessment of feasibility and, if requested, an initial cost estimate. Should an idea not be feasible exactly as envisaged, we will, where possible, develop a technically and economically viable alternative.


 

Phase 3: Development and Sampling

Depending on the project, this involves producing sketches, lighting calculations, 3D visualisations, material samples or a prototype. This allows the form, lighting effect, surface finish and technical details to be assessed at an early stage.

 

 

Your feedback is incorporated directly into the further development. Proportions, light colour, control systems, suspension and installation are fine-tuned until the solution is perfectly suited to the project.


 

Phase 4: Quotation, detailed planning and approval

Once the relevant requirements have been finalised, we draw up a robust quotation. If requested, this can also include installation by our own installation team.

 

Once the contract has been awarded, detailed technical planning begins. We usually produce CAD design drawings, which are submitted for approval before production commences. This provides all parties involved with a binding basis for implementation.

SATTLER colleague working with DIALux lighting design software on floor plan

 

Phase 5: Manufacturing at our company

Once approved, the bespoke luminaire is manufactured at our production facility in Göppingen – as a one-off, in small batches or in larger quantities for projects.

 

 

Design & construction, electronics, surface finishing, assembly preparation and quality assurance are closely interlinked throughout this process. This enables technical details to be coordinated directly and project-specific adaptations to be implemented with precision.


 

Phase 6: Packaging, transport and installation

  1. Due to their dimensions, finishes or components, bespoke luminaires often require customised packaging. That is why we take transport, delivery and accessibility into account right from the planning stage.

  2.  
  3.  

    On request, our in-house installation team can carry out professional installation on site. This ensures that planning, manufacture and installation remain under one roof, particularly for large-format luminaires, bespoke designs or complex ceiling connections.


 

Information required for an initial appraisal

A small amount of information is often sufficient for an initial assessment:

 

  • a brief description of the idea or requirement
  • sketches, plans, renderings or reference images
  • desired measurements or approximate dimensions
  • Installation context and mounting method
  • Quantity
  • Desired lighting effect or light colour
  • Timetable and project phase
  • Rough budget, if available

 

The earlier we are involved, the better we can coordinate the design, technology and implementation.


 

How long does it take to create a customized luminaire?

The project duration depends on the complexity, the amount of coordination required, the quantity and the desired scope of work. Adapting an existing luminaire range can usually be achieved more quickly than a completely new development.

 

As a rough guide, following technical approval, it often takes around eight to ten weeks for minor modifications and around twelve to fourteen weeks for complex new developments. The specific timetable is agreed on a case-by-case basis for each project.

 

In addition to production, feasibility studies, development, prototyping, approval, packaging and assembly should also be taken into account at an early stage.

Team meeting in the SATTLER lighting entrance area | © SATTLER

 

Frequently asked questions about the special lighting process