THE SATTLER FACTORY
As a third-generation family-run company based in Göppingen (Southern Germany), we have established ourselves as a renowned lighting manufacturer. Our luminaires combine decades of experience, innovative technology and precision craftsmanship – in every form of production: whether as an artistic one-off or in highly efficient series production. Our manufacturing facilities produce sculptural lighting objects such as FAVO and AVVENI, which stylishly showcase rooms. At the same time, we offer efficient series solutions for larger projects, ensuring the highest quality and flexibility ‘Made in Germany’.
A Family Business with Tradition
SATTLER stands for generations of craftsmanship and innovation in design. Founded as an electrical installation business by Hans Sattler in the 1950s (1958), the company began to specialise in lighting from 1987 onwards. It was taken over by Ulrich Sattler as the second generation of the family and is now led by Tim and Sven Sattler; the company combines tradition and innovation. Since Ulrich stepped down from the management team in July 2024, he has been working for us as a creative consultant and designer, ensuring that his vision continues to shape the company.
Our family roots and close-knit community are what set us apart. We combine many years of experience with new ideas to continuously develop our luminaires. This ongoing development and our commitment to the highest quality define our work.
Milestones in the history of SATTLER GmbHOur manufactory produces lamps that impress with their precision craftsmanship and attention to detail. Each lamp is carefully crafted with a high degree of expertise. This dedication to craftsmanship makes every SATTLER lamp a masterpiece.



Our materials come from regional suppliers and emphasise our commitment to quality. By using high-quality surfaces, we create timeless luminaires that are not only functional but also inspire as design objects.
Premium Surfaces and Materials
At SATTLER, we only use authentic materials and surfaces. This means that wood or moss don't just look like wood, but are genuine natural products - e.g. as real wood veneer. Our premium surfaces are characterised by their durability and special feel. Each surface is carefully selected to ensure aesthetic and functional quality. We work closely with regional partners to ensure short supply chains and sustainable processes. If required, we can also fulfil individual special requests.



Customised project luminaires
At SATTLER, we go beyond standard solutions. We offer customised project luminaires that precisely meet the requirements of your rooms – whether by modifying existing luminaires or by developing completely new special solutions.
Thanks to our in-house production processes and expertise, even the most demanding designs can be realised. By customising size, shape, technology and materials, we can perfectly match each luminaire to your project.
The SATTLER Lighting Factory
Sven Sattler presents
Our Sustainability Approach
Sustainability is at the heart of everything we do at SATTLER. With our circular economy and the SATTLER-RE sub-brand, we create long-lasting products that can be reused, recycled or redesigned multiple times. By producing locally and working closely with local partners, we minimise our environmental impact and strengthen the local economy.
We take responsibility – for our environment, our employees and future generations. Every SATTLER luminaire is a step towards a more sustainable future.
Project Support from Lighting Design to Installation
At SATTLER, we offer a complete service from the initial idea to the finished installation. Our team is with you throughout the entire process – from lighting design to technical production and precise installation. We work closely with our customers to create customised solutions.
This close collaboration and our expertise enable us to ensure that our lighting solutions are not only aesthetically impressive, but also technically and functionally convincing. Our aim is to use light to transform spaces into something unique.
Our team:
passion
for light
Behind every SATTLER luminaire is a dedicated team of experienced craftsmen, designers and engineers who are passionate about developing lighting solutions that redefine spaces. As a third-generation family-run company, we combine tradition with the latest technology and innovation. The Sattler family has shaped the company since its foundation and ensures that the highest quality and precision are implemented in every detail – from the initial idea to the final assembly.
Our family-like corporate culture is at the core of our success. It is reflected in our commitment to long-term partnerships, the close cooperation within our team and our responsibility to our region. With each generation, we set new impulses without losing sight of our roots – and ensure that tradition and innovation always remain in harmony.
Become part of our creative and innovative team and help us shape the world of light.
Author: Tim Sattler